华星东方公司承建的吉林省长春市农安生活垃圾焚烧发电项目烟气净化工程于2023年11月02日通过72+24小时试运行。
The flue gas cleaning project of agricultural household waste incineration power generation project in Changchun city, Jilin province, which was constructed by our company, passed 72+24 hours trial operation on November 02, 2023.
该项目总设计规模日焚烧处理生活垃圾1600吨/日,分二期建设,一期设计处理规模800吨/日,配置2台400t/d炉排型垃圾焚烧炉,年处理规模29.2万吨,二期项目处理规模800吨/日。烟气处理采用“半干法(旋转喷雾反应塔)+干法(喷射氢氧化钙)+活性炭喷射+布袋除尘器+飞灰输送”的烟气净化工艺,为我司EPC工程。
The project has a total designed daily incineration capacity of 1,600 tons of domestic waste per day. It will be constructed in two phases. The first phase has a designed processing capacity of 800 tons per day. It is equipped with two 400t/d grate-type waste incinerators and has an annual processing capacity of 292,000 tons. The processing capacity of the second phase project is 800 tons/day. The flue gas treatment adopts the flue gas cleaning process of semi-dry method (rotating spray reaction tower) + dry method (injection of calcium hydroxide) + activated carbon injection + bag dust collector + fly ash transportation, which is our EPC project.
华星东方在吉林省的业绩涵盖包括:吉林、吉林舒兰、通化梅河口、长春农安、长春德惠、长春一期、二期、三期、松原等多个项目。Jiangsu Huaxing East’s performance in Jilin Province includes multiple projects such as Jilin, Jilin Shulan, Tonghua Meihekou, Changchun Nongan, Dehui, Changchun Changchun phase I, II, and III, Songyuan, etc.